The proposed Aldi supermarket at Burraton Field has become one of the most closely watched planning issues in Saltash. But behind the debate about traffic, green space and replacement sports facilities lies a more fundamental question: what is the legal history of the land, and was everything done correctly before Cornwall Council agreed to its potential sale?
At a public meeting on 27 October 2026, residents raised questions about the validity of Cornwall Council’s disposal notice and the possibility that the recreational ground is protected by an existing statutory trust.
Aldi’s representatives were unable to answer the question at the meeting and said they would refer it to their legal team.
So what do the documents actually tell us?
In Saltash News has examined Cornwall Council’s original disposal report, Land Registry information, the published disposal notices, correspondence between Cornwall Council and Saltash Town Council, and Aldi’s own consultation material.
The documents reveal a complicated history involving a conditional sale, disputed consultation, more than one round of public notices and an important gap in the publicly available land history.
They do not, at present, establish that the proposed sale is unlawful. Nor do they establish that a statutory trust exists or has been discharged.
But they do identify questions that deserve clear answers before the future of this land is decided.
First, what land are we talking about?

The proposed Aldi development concerns land on the west side of Callington Road, in the Burraton area of Saltash.
The Land Registry title is CL233242, registered as freehold land with Cornwall Council as the registered proprietor.
The title information describes the property as land on the west side of Callington Road, Saltash. The summary obtained on 23 March 2026 identifies Cornwall Council as the registered owner.
The Cornwall Council disposal report describes the proposed disposal area as approximately 2.3 acres and calls it Burraton Sports Field.
It is important to distinguish this parcel from the wider Burraton recreation and rugby club area. The proposed sale relates to a defined part of the wider site, not necessarily every area that local people associate with Burraton Field.
The precise boundaries matter because any restrictions, leases, trusts or recreational rights must be examined against the actual land proposed for disposal.
The Land Registry title is an important starting point, but ownership is not the same thing as an unrestricted right to sell land. A council can own land while also being subject to legal obligations governing how it must be held or used.
The original purchase: a missing piece of the story
One of the most interesting points raised at the October meeting came from Cornwall councillor Sean Smith.
According to the report of the meeting, he told residents that his grandfather had sold Burraton Field to the then council for £1,000. He questioned what his grandfather would think about the prospect of the land being sold for supermarket development.
That is an important piece of local history, but the original transaction document has not yet been located in the public material examined for this investigation.
The Land Registry information confirms Cornwall Council’s registered ownership. It does not provide the original purchase price or, in the material available, establish the circumstances and purpose of the original acquisition.
The register records an entry dated 16 January 2007 and identifies Cornwall Council as the registered proprietor. That date should not be mistaken for proof that the council originally bought the land in 2007.
To establish the full history, we need the original conveyance or transfer, together with any earlier deeds and council records.
In particular, we need to know:
- Who originally owned the land?
- When was it transferred to the council or its predecessor?
- Was the reported £1,000 payment recorded in the conveyance?
- Was the land acquired specifically for recreation or public enjoyment?
- Did the original transfer contain conditions, restrictions or a declaration of trust?
- Was the land acquired under any particular statutory power?
These are not merely historical questions. The purpose and legal terms of the original acquisition could be relevant to the council’s present ability to dispose of the land.
At present, the £1,000 figure is an account given at the public meeting, not a fact independently verified by the original conveyance.
What Cornwall Council decided in 2024
The first major document in the disposal process is a report dated 29 August 2024, entitled Release of Burraton Field, Saltash.
It was prepared for the Leader of Cornwall Council and concerned the potential disposal of the freehold.
The report describes the land as a sports field of approximately 2.3 acres. It says the site had historically been used as a football pitch, generally around once a week during the football season, although use during the 2023/24 season had been substantially lower.
It also says the land was being used informally by Saltash Rugby Club, which leases the adjacent property from Cornwall Council.
The report records that Cornwall Council had received an unsolicited bid to purchase the property for development.
The proposed approach was not an immediate unconditional sale.
Instead, the recommendation was that Cornwall Council enter into an option agreement or conditional contract. The purchaser would be able to proceed with the purchase if it secured detailed planning permission for the proposed development and satisfied the relevant conditions.
The report recommended three things:
- Enter into an option agreement or conditional contract to dispose of the property.
- Delegate authority to officers to finalise the terms.
- Subject to the agreement’s conditions being satisfied, declare the property surplus and dispose of it.
The report also stated that the sale would be conditional on the purchaser meeting the cost of any planning requirements for alternative leisure or sports provision in the local area.
This is significant because it shows that Cornwall Council’s original decision was intended to provide a potential purchaser with certainty while requiring planning permission before the freehold transfer took place.
The council was not granting planning permission through this decision. It was acting as the landowner.
The planning authority would still have to assess the development through the separate statutory planning process.
Why did Cornwall Council consider selling it?
The 2024 report gives several reasons.
Cornwall Council considered the existing sports provision underused and said the property was not required to support another council service or activity.
The report also identified the potential to generate a capital receipt from the disposal and reduce annual holding costs by approximately £3,000.
It suggested that the development could provide additional facilities for Saltash residents, with any necessary replacement or improvement of sports provision secured through planning conditions or a Section 106 agreement.
The report considered three options:
- Sell through a conditional agreement.
- Offer the opportunity on the open market.
- Do nothing and continue holding the land.
The officers’ recommendation was to pursue the conditional disposal.
The report also explained why a one-to-one transaction was proposed rather than a wider marketing exercise. It said that a potential purchaser might not be prepared to spend the time and money needed to obtain planning permission without some certainty of exclusivity.
The financial details, including the proposed sale price and the bidder’s identity, were placed in exempt appendices because the council considered them commercially sensitive.
The public report therefore gives us the broad reasoning behind the decision, but not the full financial assessment or the complete terms of the proposed transaction.
That is an important limitation when assessing whether the council obtained the best consideration reasonably available.
The consultation dispute: what did Saltash Town Council know?
Perhaps the most significant disagreement in the documentary record concerns consultation with Saltash Town Council.
The August 2024 Cornwall Council report contains a section headed Consultation and Engagement.
It states that representatives of Saltash Town Council had been consulted and that they were supportive of the principles of the recommendations, although some concerns about highways matters had been raised.
That statement later became the subject of a formal complaint from Saltash Town Council.
In a letter dated 7 April 2026, the Town Clerk wrote to senior Cornwall Council officers expressing concern about the way the potential disposal had been handled.
The letter says that, in summer 2024, the Mayor, Deputy Mayor and Town Clerk received a confidential briefing that Cornwall Council was considering disposing of the property.
According to the Town Council, only limited information was provided and the impression was that further contact would follow if the proposal progressed.
The letter says no further communication arrived, and those involved concluded that the matter was no longer progressing.
The Town Council subsequently discovered that Cornwall Council had been holding confidential discussions with Aldi for around a year.
It disputed the wording in the 2024 report that the Town Council had been consulted and was broadly supportive.
The letter states that only the two members who had been briefed, together with the Town Clerk, were aware of the initial discussion and that no wider consultation had taken place.
This is the Town Council’s account of events, rather than an independent finding that no contact of any kind occurred.
Cornwall Council responded on 3 February 2026.
Its response acknowledged that the wording in the covering report could have been clearer about engagement with Town Council representatives.
However, Cornwall Council said its Monitoring Officer did not consider the matter a material issue affecting the decision.
The response also confirmed that the council had entered into a conditional contract with Aldi.
Cornwall Council stressed that the decision to dispose of the property had been made in its capacity as landowner and was separate from its role as statutory planning authority.
It said the sale would only proceed if Aldi obtained planning permission and addressed local concerns about the loss of facilities.
This distinction matters.
The Town Council’s concerns about consultation are documented. Cornwall Council has acknowledged that the wording could have been clearer, but has maintained that the issue did not invalidate its decision.
The planning application remains a separate process in which Saltash Town Council can make formal representations.
The disposal notices: why are there different dates?
Another important part of the investigation concerns the public notices required before a council disposes of land held as public open space.
Section 123(2A) of the Local Government Act 1972 requires a council proposing to dispose of open space to advertise its intention in a local newspaper for two consecutive weeks and consider any objections received.
Cornwall Council’s August 2024 report expressly recognises that the Burraton land was public open space and that the disposal needed to be advertised before the option agreement was entered into.
The documentary timeline is not straightforward.
July 2025: the notices described by the Town Clerk
The Town Clerk’s correspondence and subsequent Town Council reporting refer to notices published in the Cornish Times during 2025.
Cornwall Council’s later account refers to notices on 9 and 16 July 2025 and says no comments were received.
However, the Town Clerk’s letter of 7 April 2026 describes a notice published in June 2025.
This is a discrepancy in the dates recorded in the available accounts.
It needs to be checked against the actual newspaper editions rather than assumed to be a simple typographical error.
November 2025: a second public notice
A further notice is publicly available on the Public Notice Portal.
It is dated 5 November 2025 and was published on the portal on 12 November 2025.
It lists four parcels of land, including:
Land at Callington Road, Burraton, Saltash, PL12 6EN.
The notice states that the land is held as open space by Cornwall Council.
Crucially, it describes itself as notice given for the second time under Section 123(2A) of the Local Government Act 1972.
It invited objections or representations by 19 November 2025.
A copy of a plan showing the land was available on request from Cornwall Council.
This raises several questions that the available documents do not answer:
- Why was a further notice published in November?
- Was it a replacement, correction or second stage of the earlier notice process?
- Were the July notices the first two consecutive publications?
- Did the November notice relate to exactly the same land boundary?
- Were any objections received in response to either round?
- What plans were supplied to the public to identify the land?
The notice’s description of the land as being at Callington Road, Burraton, with postcode PL12 6EN, was challenged at the October 2026 public meeting.
Save Saltash Green Spaces questioned whether the address was correct and whether this affected the validity of the notice.
An address or postcode discrepancy does not automatically invalidate a statutory notice. The more important question is whether the land was adequately identified, including by the plan referred to in the notice.
We have not yet obtained the plan supplied with the notice, so it is not possible to reach a conclusion about whether the correct parcel was identified.
This is one of the most important documents still needed.
The statutory trust question: is Burraton Field legally protected?
This is the issue that has attracted considerable attention since the October public meeting.
Save Saltash Green Spaces raised the possibility that the recreational land is subject to an existing statutory trust.
The group suggested that if the land is protected by such a trust, the proposed sale could be legally restricted.
It is important to understand what this means.
A statutory trust is not simply a label applied to a piece of land because people have used it for recreation.
Certain legislation can impose legal duties on land held by local authorities for public enjoyment.
One relevant example is Section 10 of the Open Spaces Act 1906. Where land is held under the Act, the council is required to hold it in trust for the purposes set out in the legislation, including public enjoyment, subject to the statutory provisions.
However, the fact that Cornwall Council describes Burraton Field as public open space does not, by itself, establish that it is held under the Open Spaces Act 1906.
The land could have been acquired or held under different legal powers, and the original conveyance and council records are important in identifying the applicable position.
There are therefore two separate questions:
First: is the land subject to a statutory trust or another legal restriction?
Second: if it is, what legal process would be required before it could be disposed of or redeveloped?
The documents examined for this investigation do not answer the first question conclusively.
The Land Registry title identifies Cornwall Council as the registered owner. It records certain property rights and leases, but it does not contain an express entry identifying a statutory trust over the proposed Aldi site.
That does not prove that no statutory trust exists. Some legal obligations arise through legislation and the circumstances of acquisition rather than appearing as a straightforward entry on the title register.
Equally, the existence of a public open-space designation does not prove that a statutory trust under the 1906 Act applies.
We have not located an original trust declaration, a deed establishing a trust, or a formal instrument discharging one.
It would therefore be wrong to state that the proposed sale is unlawful because a statutory trust definitely exists.
It would also be wrong to state that no trust exists simply because one is not expressly mentioned in the title register.
The original acquisition records and Cornwall Council’s legal assessment are needed.
What does the Land Registry tell us?
The Land Registry title CL233242 is useful, but it has limitations.
The information available identifies Cornwall Council as the freehold proprietor.
It also records property interests including drainage and utility rights and leasehold matters.
A 50-year lease dated 7 May 2024 is recorded in relation to the clubhouse and premises at Burraton Field.
That is relevant to understanding the wider site and the relationship between the council and Saltash Rugby Club.
However, the lease does not establish a statutory trust over the proposed Aldi development parcel.
Nor does the registered ownership alone establish that the land can be sold without any further legal considerations.
The title plan must also be compared with the disposal notice plan and the proposed development boundary. It is essential to know that the same land is being referred to in each document.
Aldi’s proposal: what is being considered?
Aldi has publicly confirmed its intention to build a new store on land west of Callington Road in Saltash.
Its consultation website describes a proposed investment of approximately £10 million and says that, if approved, the development could provide around 40 local jobs.
Aldi also says it has exchanged contracts to buy the site from Cornwall Council.
That wording is important. An exchange of contracts is not necessarily the same as the completed transfer of the freehold.
Cornwall Council’s February 2026 response describes the arrangement as a conditional contract, while the 2024 disposal report explains that the freehold transfer would follow if the required planning conditions were satisfied.
The planning application is therefore central to the future of the sale.
Aldi held public consultation events in January and February 2026, including an exhibition at Saltash Rugby Club.
At the extraordinary Saltash Town Council meeting on 27 October 2026, Aldi’s consultants presented updated proposals.
The reported changes included a smaller and reconfigured store, 113 parking spaces and electric vehicle charging.
Aldi’s representatives said the planning application was expected in November 2026, with construction potentially beginning in 2027 if permission is granted.
The application had not been verified as a validated planning application in the records examined for this article.
That means the detailed planning documents are not yet available for a full independent assessment.
The replacement sports provision
The original Cornwall Council report made the potential disposal conditional on alternative sports or leisure provision being addressed through the planning process.
At the October 2026 meeting, Aldi’s representatives identified improvements to the pitch at Saltash Community School as the preferred replacement provision.
The proposal was described as upgrading the pitch to 3G, with evening and weekend community use.
The meeting report also records that the school would be responsible for ongoing costs, including maintenance, with arrangements to be set out through a future Section 106 agreement.
This is an important point because replacement provision is not simply a question of whether another pitch exists.
The planning process will need to consider whether the proposed alternative is suitable, accessible and capable of meeting the needs currently served by Burraton Field.
There are also wider community uses to consider.
At the October meeting, the rugby club’s president argued that the school pitch would not replace the open space’s value for informal recreation and picnics.
That is a community concern rather than a formal planning conclusion, but it illustrates why the replacement question extends beyond the provision of a football surface.
What happened at the public meeting?
More than 100 residents attended the extraordinary meeting at Wesley Church on 27 October 2026.
The presentation by Aldi’s consultants was followed by questions from councillors and members of the public.
Issues raised included:
- The loss of green space.
- Traffic congestion on Callington Road.
- Access arrangements and vehicle movements.
- Drainage and surface water.
- The proposed replacement sports pitch.
- The suitability of Treledan as an alternative location.
- The possible statutory trust over Burraton Field.
- The accuracy and validity of the disposal notice.
Aldi’s representatives said Treledan had been considered as a potential site but had been ruled out.
The traffic consultants discussed surveys and possible changes to traffic-light sequencing at Carkeel.
The statutory-trust question was referred back to Aldi’s legal team.
The meeting did not determine whether the land could legally be sold or whether planning permission should be granted.
Those are separate matters requiring evidence and formal decisions.
What happens next?
There are two processes to watch.
The first is the legal and property process between Cornwall Council and Aldi.
The second is the planning application, which will determine whether the proposed development is acceptable in planning terms.
The planning application should provide a much fuller set of documents, including:
- Site location and ownership plans.
- Proposed layout and elevations.
- Transport assessment.
- Highway access and traffic information.
- Drainage strategy.
- Ecological reports.
- Planning statement.
- Assessment of the loss of sports provision.
- Details of the proposed replacement facilities.
- Any draft Section 106 agreement.
These documents will allow residents, Saltash Town Council and statutory consultees to assess the proposal in detail.
The planning authority will need to consider the relevant planning policies and evidence. The fact that Cornwall Council has agreed a conditional sale does not guarantee planning permission.
Likewise, a planning permission would not automatically answer every question about the original acquisition or any legal restrictions affecting the land.
The documents still missing
Our investigation has identified five particularly important outstanding requests.
1. The original conveyance
The original transfer or conveyance by which Burraton Field was acquired, including any conditions, covenants or declaration of trust.
This would help establish the original purpose of the land and whether the reported £1,000 purchase price is correct.
2. The disposal notice plans
The actual plans supplied with the July and November 2025 notices.
These need to be compared with the Land Registry title plan and the proposed Aldi development boundary.
3. The statutory trust assessment
Any legal advice held by Cornwall Council on whether Burraton Field is subject to a trust under the Open Spaces Act 1906 or another legal obligation, and what that means for disposal.
4. The complete disposal record
The option agreement or conditional contract, subject to any lawful redactions, together with the final decision record and confirmation of whether the freehold transfer has completed.
5. The planning application
The validated application and its full supporting documents once submitted.
These records would allow the public to move beyond competing interpretations and understand the actual legal and planning position.
What we know — and what we do not
The documentary position can be summarised as follows.
| Question | What the evidence currently establishes |
|---|---|
| Who owns the registered freehold? | Cornwall Council, according to title CL233242. |
| Is the land treated as public open space? | Yes. Cornwall Council’s disposal report and public notice describe it as such. |
| Did Cornwall Council consider selling it? | Yes. A report dated 29 August 2024 recommended a conditional disposal. |
| Was a conditional agreement made with Aldi? | Cornwall Council confirmed in February 2026 that it had entered into one. |
| Was there a dispute over Town Council consultation? | Yes. Saltash Town Council challenged the wording in the 2024 report; Cornwall Council acknowledged it could have been clearer. |
| Were disposal notices published? | Yes. July publications are referred to in council records, and a November 2025 notice is publicly available. |
| Is there a statutory trust? | Not established by the documents examined. |
| Has a statutory trust been discharged? | No discharge document has been located. |
| Has the original conveyance been found? | Not yet. |
| Has Aldi completed the purchase? | Not established. The available documents describe a conditional arrangement and exchanged contracts. |
| Has planning permission been granted? | No. A planning application was expected in November 2026, according to the October meeting report. |
A question of public land, public confidence and evidence
The debate over Burraton Field is not simply a question of whether Saltash needs another supermarket.
Aldi has set out its case: a new store, investment, jobs and improved access to its products.
Residents and community representatives have raised concerns about the loss of open space, traffic, drainage and whether the proposed replacement sports provision would meet local needs.
But there is another issue that deserves attention: the legal history of land held by a public authority.
Cornwall Council’s own report describes Burraton Field as public open space. It proposed a conditional sale and acknowledged that the disposal needed to comply with Section 123 of the Local Government Act 1972.
The Town Council has challenged the way consultation was described in the original report. Cornwall Council has acknowledged that the wording could have been clearer, while maintaining that the decision was not materially affected.
The public notices raise further questions about dates, descriptions and the plans used to identify the land.
And the original conveyance — the document that could help establish why the land was acquired and on what terms — remains a missing part of the public record.
None of this proves that the proposed sale is unlawful. But equally, the absence of a trust entry on the Land Registry title does not settle the question of whether statutory obligations apply.
The public deserves a clear answer based on the original deeds, the relevant legal powers and the actual land boundaries.
Before the future of Burraton Field is decided, Saltash needs to know exactly what Cornwall Council owns, what obligations attach to it, and what legal steps have been taken to allow it to be sold.
In Saltash News will continue to follow the planning application and seek the outstanding documents from Cornwall Council.
Sources and documents
- Cornwall Council – Release of Burraton Field, Saltash (29 August 2024)
- Land Registry title information – CL233242
- Saltash Town Council – letter to Cornwall Council (7 April 2026)
- Cornwall Council – response to Saltash Town Council (3 February 2026)
- Public Notice Portal – Cornwall Council disposal notice (November 2025)
- Aldi – proposals for a new store in Saltash
- Aldi – proposed development and consultation information
- Saltash Town Council – extraordinary Planning and Licensing Committee, 27 October 2026
- Cornish Times – report on the October 2026 public meeting
Editorial note: This article distinguishes documentary evidence from statements made by councils, Aldi and members of the public. The existence or discharge of a statutory trust has not been independently established. The original conveyance and the disposal notice plans have not yet been obtained.